Opaki Road Stormwater Upgrades
Project Name
Opaki Road Stormwater UpgradesType of works provided
Stormwater UpgradesProject location
Masterton, WairarapaClient
Masterton District CouncilEngineer
Masterton District Council
The works involved site clearing and demolition, constructing a new stormwater network on Opaki Road and Oxford Street. Approx. 290m of new RCRRJ 225 - 375mm concrete pipe was installed along with 6 1050 manholes, the construction of a new modular soakage pit and reinstatement to MDC and NZTA standards. Approx. 400m3 was excavated to install new Rain Smart Modular System.